Tel Aviv Metro M2 – blue line
Construction scope: 610,000 sq.m., Client: NTA, Construction time: 2030, Status: on deposit
Armon plans the blue line of Holon-Tel Aviv-Bnei Brak-Petah Tikva that includes 25 stations
Construction scope: 610,000 sq.m., Client: NTA, Construction time: 2030, Status: on deposit
Armon plans the blue line of Holon-Tel Aviv-Bnei Brak-Petah Tikva that includes 25 stations